Documents for appliying of new kit in the u.s army

When applying for a new kit in the U.S. Army, you'll need to submit various documents to support your request. Here are some of the common documents required:

  1. DA Form 2823: Request for Equipment or Material (RFE) - This is the primary document used to request new equipment or material. You can find the form on the Army's website or through your unit's supply office.
  2. DA Form 2062: Equipment Request and Issue Voucher - This form is used to request equipment and to provide a voucher for the equipment when it's issued.
  3. DA Form 5988-E: Request for Equipment or Material (RFE) - This is an electronic version of the DA Form 2823, used for online submissions.
  4. DA Form 2409: Request for Authorization to Obtain Equipment or Material - This form is used to request authorization to obtain equipment or material that requires approval from higher headquarters.
  5. DA Form 2408: Request for Authorization to Obtain Equipment or Material (Electronic) - This is an electronic version of the DA Form 2409, used for online submissions.
  6. Unit SOP: Standard Operating Procedures (SOP) - Your unit's SOP may require specific documentation or procedures for requesting new equipment or material.
  7. Budget Justification: A budget justification document may be required to justify the need for the new equipment or material.
  8. Technical Data Package: A technical data package may be required to provide detailed information about the equipment or material being requested.
  9. DA Form 5988-S: Equipment Return Voucher - This form is used to return equipment to the Army's inventory when it's no longer needed.
  10. DA Form 2406: Equipment Disposition Voucher - This form is used to dispose of equipment that's no longer needed or is being replaced.

In addition to these forms, you may need to provide other documents, such as:

It's essential to check with your unit's supply office or higher headquarters to determine the specific documents required for your request. They may have additional requirements or specific procedures for submitting requests for new equipment or material.