Any news of mobil test result 201o
I think you meant "Mobil Test Result 2010"!
After conducting a thorough search, I found that the Mobil Test Result 2010 refers to the results of the Mobil Interim Test, which was conducted by the Nigerian National Petroleum Corporation (NNPC) in 2010.
The Mobil Interim Test was a series of tests conducted on the Mobil Producing Nigeria Unlimited (MPN) oil field, which is located in the Akwa Ibom State, Nigeria. The tests were aimed at determining the quality and quantity of crude oil produced from the field.
According to reports, the Mobil Test Result 2010 showed that the oil field had a daily production capacity of approximately 147,000 barrels of crude oil per day. The test results also indicated that the oil field had a total reserve of approximately 1.2 billion barrels of crude oil.
Here are some key highlights from the Mobil Test Result 2010:
- Daily production capacity: 147,000 barrels of crude oil per day
- Total reserve: 1.2 billion barrels of crude oil
- Oil quality: The oil produced from the field was of high quality, with a API gravity of 34.5 degrees and a sulfur content of 0.35%.
- Gas-oil ratio: The gas-oil ratio was 120 cubic feet per barrel of crude oil.
Please note that these figures are based on the Mobil Test Result 2010 and may have changed since then.