Abuja international airport new terminal
The new terminal at Abuja International Airport, also known as the Nnamdi Azikiwe International Airport Terminal, is a modern and state-of-the-art facility that was opened in 2017. Here are some key features and facts about the new terminal:
Design and Architecture: The terminal was designed by the Nigerian architecture firm, Messrs. PWA, in collaboration with the Chinese construction company, China Civil Engineering Construction Corporation (CCECC). The terminal's design is inspired by traditional Nigerian architecture and features a unique blend of modern and traditional elements.
Capacity: The new terminal has a capacity to handle 5 million passengers per annum, making it one of the largest in West Africa.
Facilities: The terminal features a range of modern facilities, including:
- 24 check-in counters
- 12 immigration counters
- 6 baggage claim belts
- 12 security screening points
- 4 aerobridges
- 12 aircraft parking bays
- A VIP lounge
- A business center
- A duty-free shop
- A restaurant and bar
- A prayer room
- A children's play area
Security: The terminal has a robust security system, including CCTV cameras, metal detectors, and explosive detection systems.
Air Traffic Control: The terminal is equipped with a modern air traffic control system, which enables efficient and safe air traffic management.
Runway and Apron: The terminal has a 3,500-meter-long runway and a 120,000-square-meter apron, which can accommodate large aircraft such as the Boeing 747 and the Airbus A380.
Environmental Sustainability: The terminal was designed with environmental sustainability in mind, featuring energy-efficient lighting and air conditioning systems, as well as a rainwater harvesting system.
Awards and Recognition: The Abuja International Airport Terminal has received several awards and recognition, including the "Best Airport Terminal in Africa" award at the 2018 African Airport Awards.
Challenges: Despite its modern facilities and capacity, the terminal has faced some challenges, including delays and cancellations due to weather conditions, air traffic congestion, and technical issues.
Future Plans: The Federal Airports Authority of Nigeria (FAAN) has plans to further expand and upgrade the terminal, including the construction of a new concourse and the installation of advanced security screening systems.